Client
Avista Corporation
Client
Avista Corporation
Status
Completed
Status
Completed
Location
Spokane
Location
Spokane
Market/Project Expertise
Energy
Market/Project Expertise
EnergySTRATA performed Special Inspection and Construction Materials Testing during the construction of a new 171,000 square foot parking facility, located immediately west of the Main Building on the Avista Mission Campus. The new Avista Spokane parking garage is five floors with a total of 504 parking stalls. Construction included cast-in-place concrete column pads, continuous footings, stem walls, perimeter walls, shear walls, columns, slab-on-grade, prestressed spandrel beams, and post-tensioned elevated slabs. Additional building construction included concrete masonry unit (CMU) stairway/elevator walls at the north and south ends of the building, and a structural steel framed roof.