The Jerome County Jail is developed on approximately 8 acres. The addition to the Jail will include two new pods Read more...
Status: Completed
Client:
City of Meridian Parks and Recreation
Phase II of Discovery Park consists of developing approximately 77 acres from agricultural purposes into a regional park. The development Read more...
Status: Completed
Client:
Desert Sands, LLC
We understand approximately 1,465-feet of waterline and 1,315-feet of the sewer line will be installed for the Ridge Subdivision. CONSTRUCTION Read more...
Status: Completed
Client:
Pocatello/Chubbuck SD25
We understand a Concession Stand/Pressbox will be constructed near the football/track bleachers. This building footprint is approximately 20-feet by 40-feet Read more...
Status: Completed
Client:
Alpine Cleaning and Restoration Specialists
We understand that Alpine Cleaning will subcontract URETEK USA, Inc. to perform polyurethane grout injections to mitigate floor slab damage Read more...
Status: Completed
Client:
Maverik, Inc.
The Maverik Store #651 project includes constructing an approximate 5,073 square-foot single-story building with slab-on-grade flooring and metal stud-framed walls Read more...
Status: Completed
Client:
Gilson Engineering
The water system lines and pavement were replaced at the Ashton Hydroelectric Plant in Ashton, ID. CONSTRUCTION SERVICES During the Read more...
Status: Completed
Client:
Byron Beck Builders
This project consists of sidewalk replacement and various site fixes near the Neonatal Intensive Care Unit building at Eastern Idaho Read more...
Status: Completed
Client:
Big Dog Solar Energy
We understand that solar panels will be placed on three canopies for the Bell Black office in Rexburg, Idaho. The Read more...
Status: Completed
Client:
Kansas Asphalt, Inc.
STRATA provided quality control testing and inspection services for the Home Depot Parking Lot #1802 in Idaho Falls, Idaho; the Read more...